A 20-foot sound wall was installed on Monday at a construction staging yard for the Wilshire/Rodeo Drive subway station at Wilshire Boulevard and Reeves Drive in Beverly Hills.

Work is progressing at a construction staging yard along Wilshire Boulevard in Beverly Hills, where a sound wall was recently installed. (photo by Edwin Folven)
Similar to barriers at other subway station construction sites along Metro’s Purple Line Extension project, the sound wall will reduce noise during work hours from 8 a.m. to 6 p.m., Monday through Friday.
Drilling and soil sampling to assess the geology of the tunnel route under Beverly Hills is also progressing. Eastbound Wilshire Boulevard will be reduced to one lane between Spalding Drive and Roxbury Drive during work hours from 8 a.m. to 6 p.m., Monday through Friday. All three lanes on westbound Wilshire Boulevard will remain open.
Near the Wilshire/La Cienega subway station site, North Gale Drive will be closed from 6 a.m. to 6 p.m.. Monday through Saturday. Lane reductions and turn lane restrictions on Wilshire Boulevard may also be in place between Stanley and Hamilton drives.
The next monthly meeting on the subway construction in Beverly Hills will be held on Wednesday, Feb. 6, from 6:30 to 8 p.m. at Beverly Hills City Hall, Second Floor Municipal Gallery, 455 N. Rexford Drive.
Work is also occurring at other locations along the route. Near Wilshire Boulevard and Western Avenue, excavation, concrete work and street maintenance continue. Intermittent lane closures may occur near Wilshire Boulevard and Manhattan Place.
Near Wilshire Boulevard and La Brea Avenue, tunneling support is ongoing at construction stating years and from a staging area in the middle of Wilshire Boulevard just east of Sycamore Avenue. Through Friday, Feb. 8, eastbound Wilshire will be intermittently reduced to one lane between Sycamore and Mansfield avenues.
Excavation and hauling and also ongoing near Wilshire Boulevard and Fairfax Avenue. Ogden Drive will be closed intermittently at Wilshire Boulevard from 7 a.m. to 11 p.m., Monday through Friday.
For questions and concerns, call the 24-hour project hotline at (213)922-6934, email the project team at purplelineext@metro.net or visit metro.net.










0 Comment