The twin tunnel boring machines that will be placed in the ground this summer to begin digging tunnels for the Purple Line Extension will be named Elsie and Soyeon – names selected by Fairfax High School freshman Marianne Gutierrez.
The ninth grader received 41.5 percent of the 2,278 votes cast in the Los Angeles County Metropolitan Transportation Authority’s tunnel boring machine naming contest. The names were selected over those of fellow contest finalists and Fairfax High School students Valerie Castro and Tiffany Pamilar, as well as Kenny Uong, a senior at Herbert Hoover High School in Glendale, and twins Ryan and Amanda Walker, seventh graders at New Middle School Pathway in the Westchester area.

Fairfax High student Marianne Gutierrez (third from left) was joined by family and local civic leaders during a ceremony announcing that she won a contest to name Metro’s twin Purple Line Extension tunnel boring machines. Officials also recognized third grader Lauren Park (front), who won the tunnel boring machine art contest. (photo by Edwin Folven)
Metro announced the names of the tunnel boring machines on April 25 and honored Gutierrez and third grader Lauren Park, a student at Palm Crest Elementary School La Cañada whose work was selected in a separate contest to create art that will be placed on the tail-end of the boring machines. Gutierrez said she was shocked to learn she won.
“I was on spring break a couple of weeks ago and my mom was opening the mail and she screamed. That’s when I learned I won,” Gutierrez said. “I was really surprised. I didn’t think my selection of names were any better than the others. It’s very unbelievable.”
The contest winners received a $100 commemorative TAP card to ride on the Metro system, gift cards and additional prizes valued at over $350. The naming of tunneling machines is a mining tradition that dates to the 14th century and is symbolic of protection and good luck, according to Metro.
Gutierrez chose the name Elsie in honor of female engineer Elsie Eavers, the first woman to be elected as a member of the American Society of Civil Engineers. The word Soyeon means bright and beautiful in Korean and was chosen in honor of Yi Soyeon, a female astronaut and mechanical engineer.
“I decided to name them after a woman who was a civil engineer because this is a civil engineering project, and I chose Soyeon because it is a Korean name and [the subway] is going through Koreatown.”
Mayor Eric Garcetti and Councilman David Ryu, 4th District, congratulated Gutierrez and Park during a ceremony on April 25 in a subway construction staging site on Wilshire Boulevard across from the Los Angeles County Museum of Art. Metro displayed one of the tunnel boring machine’s “cutter heads,” which has a 22-foot diameter and was painted purple in recognition of the project.
“In Los Angeles, we are building the world-class transit system that this great city deserves. We are creating a better quality of life for everyone here in L.A.,” Garcetti said. “The tunnel boring machines that we see here will begin their work in August and we expect section one to be completed in 2023.”
The two boring machines will first tunnel east toward the Purple Line’s current terminus at Wilshire Boulevard and Western Avenue. Later, they will tunnel west toward Wilshire and La Cienega boulevards – the end of Phase 1 of the project – and to Century City – the end of Phase 2. The Purple Line will extend to Westwood.
Metro Deputy CEO Stephanie Wiggins said Phase 1 is nearly 35 percent complete. Crews have completed preliminary work on the underground subway station box at Wilshire Boulevard and La Brea Avenue, and are 60 percent finished with excavation at a future subway station near Wilshire Boulevard and Fairfax Avenue. The decking for the station at Wilshire/La Cienega station is complete and excavation is beginning. Precursory work is also underway at sites in Beverly Hills and Century City along Phase 2 of the project. Plans call for the subway project to complete prior to the 2028 Olympic Games in Los Angeles.
Ryu congratulated the contest winners and said the subway will revolutionize public transportation.
“[This] is an exciting milestone for Council District 4 and the city as we build the multimodal Los Angeles of tomorrow,” Ryu said. “The Metro Purple Line will connect downtown and the west side. It will connect visitors and Angelenos to the Miracle Mile with icons like LACMA, the Academy Museum and the Petersen Museum. But most importantly, this extended Purple Line will connect Angelenos to each other.”
The tunnel boring machines were manufactured in Germany and are approximately 450 feet long. They will be lowered into the ground in pieces at the Wilshire/La Brea construction staging site and assembled prior to heading east toward Western Avenue.
The machines will travel approximately 60 feet per day, tunneling five days per week, 20 hours per day. It will take approximately two years to complete the tunnels for Phase 1 of the project, which is expected to open in 2023. The Purple Line Extension is expected to transport 59,000 riders daily, including 17,000 new riders. Phase 2 of the project is expected to open to Century City in 2026.









0 Comment