Work will occur in the staging areas at the Beverly Drive station, but no work will occur in the public right of way throughout the holidays. (photo by Edwin Folven)
Crews will temporarily suspend street-level work on Metro’s D Line subway extension project in Beverly Hills during the holidays. No construction will occur in the public right of way in Beverly Hills from Thursday, Nov. 27, through Thursday, Jan. 1.
Limited work will continue on the underground Beverly Drive station and in staging yards behind temporary walls along Wilshire Boulevard. No work will take place on Thanksgiving Day (Nov. 27), the Friday after Thanksgiving (Nov. 28), the first night of Hanukkah (Dec. 14), Christmas Eve (Dec. 24), Christmas Day (Dec. 25), New Year’s Eve (Dec. 31) and New Year’s Day (Jan. 1). Street-level subway work resumes in Beverly Hills on Jan. 2.
Metro will hold an in-person meeting with updates on progress at the Beverly Hills subway stations on Wednesday, Dec. 10, at 6 p.m. at City Hall, 455 N. Rexford Drive, Room 280A. The meeting will cover key developments for the new Wilshire/La Cienega and Wilshire/Rodeo stations including construction timelines and project milestones. To RSVP, visit eventbrite.com/e/d-line-section-1-2-project-meeting-beverly-hills-stations-tickets-1329202663949.
Work continues at other locations along the Metro D Line subway project alignment during the holidays. Construction is nearly complete on the first segment of the line between Wilshire/Western and Wilshire/La Cienega, which is anticipated to open during the first quarter of 2026. The second segment includes the Beverly Drive and Century City stations and is expected to open in 2027. The third segment with the Westwood/UCLA and Westwood/VA Hospital station is anticipated to open by the end of 2027.
Lane closures may be in place on Wilshire Boulevard around the stations in the Miracle Mile. Crews are completing street restoration work and repairing sidewalks and curbs.
At Wilshire/La Cienega, a K-rail work zone remains in place through at least the end of November on the south side of Wilshire between San Vicente and La Cienega boulevards. Crews are constructing a reinforced concrete bus pad on the south side of Wilshire Boulevard just east of La Cienega Boulevard. Two lanes of traffic remain open in the area on Wilshire Boulevard.
At the Beverly Drive Station, K-rail enclosures will remain in place along the north and south curb lanes on Wilshire Boulevard to support ongoing station construction and construction of structures adjacent to the station. Two lanes on Wilshire Boulevard will remain open in each direction between Beverly and Crescent drives. Pedestrian access will be maintained along Wilshire Boulevard.
Work is also ongoing on the future Century City subway station near Constellation Boulevard and Century Park East, and on the Westwood/UCLA and Westwood/VA Hospital stations. Deck removal at the Westwood/UCLA Station has been postponed until Friday, Dec. 12, at 11 p.m., through Monday, Dec. 15, at 6 a.m. Westbound Wilshire Boulevard will be fully closed between Veteran Avenue and Westwood Boulevard, and eastbound Wilshire Boulevard will be reduced to two lanes. Decking removal is anticipated to require an additional 10 weekends of work in the area.
For questions and concerns about the D Line Extension project, call the 24-hour project hotline at (213)922-6934, email the project team at purplelineext@metro.net or visit metro.net.









0 Comment