
Hart Park will contain engineered wood fiber in the off-leash dog playing area. (photo by Sam Mulick)
Dogs will now bark, fetch and play on engineered wood fiber – not synthetic turf – at William S. Hart Park in West Hollywood.
On Oct. 6, the West Hollywood City Council unanimously approved engineered wood fiber as the surface material for the designated off-leash play area at Hart Park, a popular West Hollywood dog park. The surface material selection precedes larger renovations to make the park compliant with the Americans with Disabilities Act. Redesign plans include leveling the park to bring the off-leash area closer to De Longpre Avenue and adding a plaza above the off-leash area. The off-leash play area – which was recognized as a permanent amenity in the park by the council on Oct. 6 – will be redesigned to include separate big and small dog spaces with a movable fence separating the two areas. The decisions come after recommendations were made by the Hart Park Ad-Hoc Subcommittee, which consisted of Councilmembers Danny Hang and Lauren Meister.
The council had directed city staff to research different possibilities for surface materials following significant pushback from dog owners after the council originally voted to install synthetic turf in the park in 2018. Urban Design and Architecture Studio Manager Ric Abramson said that engineered wood fiber is clean and safe for dogs, has drainage built into it and meets disability needs for mobility considerations. He added that the material will require regular raking and will likely be replaced several times throughout the year, but the overall long-term maintenance is less than other wood chip materials. Engineered wood fiber is made from 100% wood fiber from the interior wood of trees, not from bark, and does not include recycled materials such as dyes, petroleum products or glues commonly seen in other wood chip products, according to the staff report.
“Staff was able to identify one other potential system that seems to hit as many of the markers as possible in terms of being organic and safe and readily maintainable. There is no perfect material in this case – there’s pros and cons to each,” Abramson said. “We have talked to other jurisdictions who seem to be very happy with the material.”
Bob Claster, who has walked his dogs in Hart Park for 20 years, urged the council to reject synthetic turf, which is featured at other dog parks in the city and he said can contain toxic chemicals.
“I’d like to thank the council for finally, after exhaustive evidence was presented and many months of campaigning and protest, acceding to the community’s overwhelming desire not to have artificial turf polluting our park,” he said. “There isn’t such a thing as safe artificial turf, and it smells bad and it’s bad on about 20 different levels.”
However, Claster, and many other park regulars, decried the renovations and criticized the city for not meaningfully involving dog owners in their decisions.
“The main thing that bothered all of us was the fact that it was never a collaborative process. It was never ‘Hey, let’s all sit down and see what we can work out. We’ll make you guys happy and make us happy.’ Everything was always adversarial,” Claster said. “It took a lot of bugging them to get them to post their plans at the actual park so that people could see them and comment on them. And by that point, it was already well too late. They had already formulated these plans. They clearly were going to do what they were going to do, and they didn’t much care about how we felt about it.”
Abramson said, however, that the city has held 18 different meetings to discuss Hart Park and has posted plans and conducted outreach at the park as part of the decision-making process.
Members of the council expressed their support for the redesign.
“My colleagues and I moved this item forward so that Hart Park could be ADA accessible, as well as be an incredible space for dog guardians and their pets, neighboring organizations and businesses, and others – with or without dogs – who visited the park to enjoy the relaxing atmosphere,” Meister said. “Community outreach was fairly extensive and covered a broad and diverse range of stakeholders, beginning pre-COVID through to this most recent council meeting.”
“I’m really excited about the design of the park,” Hang said, who also pointed out that the city received feedback from small dog owners requesting a separate area from large dogs. Hang also thanked city staff for bringing samples of the engineered wood fiber to subcommittee meetings to show dog owners the material.
Councilman John Erickson thanked dog owners for their advocacy and acknowledged that many of them felt left out of the process.
“I do think the community ultimately does feel left out and as I understand, that was never the intention,” he said. “As we do more infrastructure projects, the more we can get out, the better.”
West Hollywood resident David Yocum, who has walked his dogs at the park since 2001, also criticized the city’s proposed design of leveling the park and separating the off-leash area into two separate areas. The redesigned off-leash area will feature more space than the current one, but the area designated for large dogs will be smaller than the current off-leash space, which is only one area.
“There was no outreach whatsoever at the park – not one time, except back in 2020. We were deliberately excluded from the entire process,” he said. “The new design has significant issues and problems regarding safety and comfort. We love our dogs, we thought we would be heard. We were not.”
Yocum criticized city management and the council for a process he said was not democratic.
“None of us want this change. It feels disrespectful for people that have gone there for decades, a lot of people two to three times a day, and they had no interest,” he said. “We understand the park better than anybody, and they didn’t even have any interest in getting our thoughts. We could have participated in a positive way. We could have given up stuff if we needed to, but they never just made the decisions for us and didn’t care what we had to say.”
Following the approval, landscape architectural firm Stoss, Inc. will finalize design, engineering and construction documents for the Hart Park renovation.
City staff will then commence the bidding process for a general contractor before presenting it to the City Council with the goal of awarding a construction contract in mid-2026. If approved, construction would begin shortly thereafter.








0 Comment