
Subway construction is occurring in the curb lanes on Wilshire Boulevard near Beverly Drive. (photo by Edwin Folven)
The Los Angeles County Metropolitan Transportation Authority continues to build the D Line subway extension project throughout fall, with work occurring at the subway stations and at street level in Beverly Hills. Drivers are cautioned to expect lane closures at certain locations on Wilshire Boulevard.
Most of the work is complete on the Wilshire/La Brea and Wilshire/Fairfax stations in the Miracle Mile. In Beverly Hills, work continues at street level around the Wilshire/La Cienega station. Two lanes are open in each direction on Wilshire Boulevard between San Vicente and La Cienega boulevards. A K-rail work zone remains in place along the south side of Wilshire Boulevard east of La Cienega Boulevard for street restoration work.
The alley between Lasky and Spalding drives will be closed on Oct. 23 from 8 a.m.-6 p.m. in Beverly Hills to support the removal of geotechnical instruments. Access to parking for residents and businesses will be maintained and a flagger will be on site to assist motorists. Crews are also working on the Beverly Drive station and along the curb lanes on Wilshire Boulevard. Two lanes in each direction will be maintained along Wilshire Boulevard between Beverly and Crescent drives. Left turns are restricted from westbound Wilshire Boulevard to South Cañon Drive.
At the Century City stations, plans call for deck panel removal and street restoration to begin soon on Constellation Boulevard between Century Park East and a location just west of Avenue of the Stars. Traffic control information will be provided through construction notices and direct stakeholder outreach once the schedule and specific closure details are finalized. Traffic control will be implemented in five phases progressing from east to west. After deck removal, traffic control measures will be reestablished on Constellation Boulevard to support more construction activities.
For questions and concerns about the D Line Extension project, call the 24-hour project hotline at (213)922-6934, email the project team at purplelineext@metro.net or visit metro.net.
a










0 Comment