
Street restoration work is ongoing in a K-rail work zone on westbound Wilshire Boulevard at La Cienega Boulevard. (photo by Edwin Folven)
The Los Angeles County Metropolitan Transportation Authority will be closing Wilshire Boulevard between Western Avenue and Manhattan Place this weekend for decking removal and is cautioning drivers to plan ahead.
Beginning at 9 p.m. on March 22 and continuing through 6 a.m. on March 25, workers will remove concrete deck panels on Wilshire Boulevard. Motorists are advised to use Olympic Boulevard to bypass the closure. Southbound traffic on Manhattan Place will be detoured onto westbound Wilshire Boulevard. East-west pedestrian traffic will be closed on the north side of Wilshire Boulevard between Western Avenue and Manhattan Place. A pedestrian detour will be implemented on the south side of Wilshire Boulevard.
Farther west, Wilshire Boulevard has been reduced to two lanes in each direction between Highland and La Brea avenues, and may be intermittently reduced to one lane in each direction near the Wilshire/La Brea station. A K-rail work zone will remain in place on the south side of Wilshire Boulevard between La Brea to Mansfield avenues.
Closures will also affect Orange Grove Avenue south of Wilshire Boulevard near the Wilshire/ Fairfax Station, and Wilshire Boulevard will be reduced to two lanes in each direction at La Jolla Avenue.
At the Wilshire/La Cienega subway station, street restoration work is ongoing along the north side of Wilshire Boulevard. Wilshire Boulevard will be reduced to two lanes in each direction between San Vicente and La Cienega Boulevard.
Construction is ongoing at and around the Wilshire/Rodeo subway station. The curb lane on westbound Wilshire Boulevard will be closed between Cañon and Crescent drives. A K-rail enclosure will support work on the sidewalk, alley and Cañon staging yard sound walls.
Lane closures are also anticipated near Wilshire Boulevard and Beverly Drive, which will be reduced to one lane in each direction in the area for deck access. Wilshire Boulevard will primarily remain open with three lanes in each direction between El Camino and Crescent drives. However, work may necessitate additional periodic lane closures in the area through the end of March.
In Century City, intermittent lane closures will be implemented from 8 p.m.-6 a.m. Monday-Friday on Constellation Boulevard between Solar Way and Century Park East for concrete work. The work is anticipated to run through July.
For questions and concerns about the Purple Line Extension project, call the 24-hour project hotline at (213)922-6934, email the project team at purplelineext@metro.net, or visit metro.net.











0 Comment