The Purple Line Extension project will continue with the help of Ruth and Harriet, Metro’s second set of tunnel boring machines.

Two students joined Beverly Hills Mayor John Mirisch and representative from Metro and the city and county of Los Angeles to unveil their winning entries in Century City, where a new station will be built. (photo courtesy of Metro)
The names were selected by Ruby Santamaria, a sixth grader at Turning Point School in Culver City, and announced during a news conference on June 17 at Metro’s Century City staging yard. Her entries finished in first place, receiving 52% of nearly 2,000 votes cast online, in a field that included four other students.
Ruby said she chose the names to honor Harriet Tubman, who helped many black southerners escape slavery through her underground railroad, and U.S. Supreme Court Justice Ruth Bader Ginsburg, one of her contemporary heroes.
“I feel that Ruth Bader Ginsburg is very empowering and shows that anything is possible,” she said.
The other options were Toph and Suki, which finished second with 28% of the vote; Ada and Hedy; Andromeda and Marilyn; and Edith Clark and Hedy Lamarr.
Hans Smallwood, a third-grader from Good Shepherd Catholic School in Beverly Hills, won a separate art contest with a drawing that shows the Purple Line subway running underneath Rodeo Drive.
Beverly Hills Mayor John Mirisch and a representative from Los Angeles City Councilman Paul Koretz’s office were among the elected officials on hand to honor the two students. Before presenting each student with a proclamation from the city, Mirisch spoke about how the Purple Line will fit in to Beverly Hills’ plans for more bike lanes, autonomous vehicles and other transportation improvements.
“We’re excited for all that lies ahead,” Mirisch said.
Commemorative tap cards with the winning artwork and names will be available this winter.
“Harriet and Ruth will soon usher in an exciting new phase of construction work for this critically important transit project,” L.A. County Supervisor and Metro Board Chair Sheila Kuehl said in a statement.
A representative from Kuehl’s office was also in attendance.
“We are glad to see such enthusiastic community involvement in naming these new TBMs,” Kuehl’s statement continued.
The second section of the Purple Line Extension will be 2.59 miles long, and is scheduled to open in 2025. It will have stations at Wilshire/Rodeo in Beverly Hills and Century City/Constellation in Century City. The third and final section will extend the Purple Line to Westwood, and is scheduled for completion in 2027.
“With the arrival of these two new TBMs, we are another step closer to bringing the Purple Line Extension to reality,” Metro CEO Phillip A. Washington said in a statement. “When it’s completed, the subway will reduce travel times between the westside and downtown L.A. to just 25 minutes and give Angelenos a new high-speed, high-capacity transit alternative they’ve been waiting many decades to ride.”










0 Comment