The Los Angeles County Metropolitan Transportation Authority (Metro) has provided updates on Purple Line Extension construction running from Saturday, Nov. 12 through Monday, Nov. 14.
Drilling, pile setting and concrete pouring for a future subway station will continue in the Wilshire/Fairfax area. The construction area is from Wilshire Boulevard and Ogden Drive to Wilshire Boulevard and Fairfax Avenue.
Westbound Wilshire Boulevard will be closed between Curson Avenue and Fairfax Avenue. Traffic will be detoured at La Brea Avenue, and local access will be maintained on Wilshire Boulevard.
Additionally, westbound Wilshire Boulevard will be reduced to two lanes between Hauser Boulevard and Curson Avenue, leading up to the full closure. Eastbound Wilshire Boulevard will also be reduced to one lane from Crescent Heights Boulevard to Fairfax Avenue. Turns will be restricted from Fairfax Avenue on to Wilshire Boulevard. Left turn restrictions will be in place on northbound Ogden Drive and Spaulding Avenue at Wilshire Boulevard.
The closures are from 4 a.m. on Nov. 12 through 6 a.m. on Nov. 14. Work hours for drilling and pile setting are 8 a.m. to 11 p.m. Construction support activities will occur from 11 p.m. to 8 a.m. All work has received permits and approvals. Access for pedestrians will be maintained outside the construction zone.
Construction will result in changes to bus routes and bus stops, and Metro will post signs about alternative boarding locations. The construction hotline to report problems is (213)922-6934. For information, call (323)GOMETRO.










0 Comment