Students at Shalhevet High School starting to the new school year next week really will be returning to their school.

Students can use the new turf gathering area on the roof of the remodeled Shalhevet High School to eat lunch, have class or hang out. The area is a part of the effort the school had to bring more open space to the school. (photo by Gregory Cornfield)
Students and faculty spent the last school year at the Westside Jewish Community Center (JCC) while their building was remodeled at 910 S. Fairfax Ave. Next Wednesday, they will return to the new 35,000-square-foot, three-floor facility.
Shalhevet High School also started at JCC, then operated in the Fairfax building for 22 years, before returning to JCC last year.
Before it was remodeled, the school building wasn’t actually a school building. It was a hospital building, and rumors are the building used to be a morgue as well.
“I’m not sure if there ever was an actual morgue, but it’s ingrained in Shalhevet lore,” said Robyn Lewis, the school’s executive director. “That’s all anybody wants to know. It’s been in our films, newspapers. It’s part of who Shalhevet is.”
But it definitely was a hospital.
“That’s why we needed to rebuild,” Lewis said.
She explained some of the radiation rooms had double thick walls with metal plates in them that halted Internet and computer connections.
“In terms of technology these days, it wasn’t conducive to the way kids learn at all,” she said. “It was a disaster.”
She said the school needed a more flexible building, with more open space for collaborative learning.
“None of that was possible in the old building,” she said. “We’re light years from what we had.”
Students will be happy to return to a new basketball court with the new school logo, more open spaces throughout the building and a new turf gathering area on the roof where they can eat lunch or hang out. All students and teachers will have iPads, and there is a new Apple TV in every classroom, making the renovations to the walls all that more important. They also painted the classroom walls with paint that allows them to double as dry erase boards.
With the new building, Shalhevet will implement a “360 teaching” model, Lewis said. The desks, tables and boards in the classrooms are all on wheels, and they are set up so there is no true center of the room, which all comes back to the efforts to build a collaborative learning environment.
Enrollment can be as high as 240 students in the new building. This year, there are 220 students who will attend Shalhevet, up 40 from last year.
The new features already have faculty buzzing. Principal Noam Weissman said he is most excited about the new elements that will allow the focus to be on learning.
“To have this new building is incredibly exciting,” he said. “There are no nerves. It’s simply excitement. Having everything we have now, and having everything that’s going to allow for learning to take place is what matters to us.”
Natalie Weiss, director of admissions, said it doesn’t matter where Shalhevet operates though.
“Even in the other places that we were – the converted hospital, JCC – people wanted Shalhevet for what they see inside the walls,” she said. “Shalhevet is still Shalhevet wherever it takes place, but now the kids have a building they deserve.”










0 Comment